2 room Flat For Sale. Senaki
Senaki
Area
Room
Bedroom
Floor
Area
37m²Room
2Bedroom
1Floor
2/12Description
For sale in Didube!!! Namely, on R. Agladze Street, in a premium quality multifunctional residential complex under construction by the developer company ""Sonnet Construction"", a non-standard 2-room apartment. The apartment has 1 bedroom. The living room is open-plan. It has 1 bathroom. 1 balcony. The complex consists of three blocks, which include residential, commercial and office spaces. All three blocks have two-level parking with a total of up to 400 parking spaces. The complex includes a playground, a children's entertainment square and planting of up to 50 trees and plants. The completion date of the C1 block of the complex is October 2024, the C2 block is December 2025, and the C3 block is the summer of 2026.
Details information
Condition
White Frame
Status
New building
Project
Non standard
Additional information
Balcony
Basement
Elevator
Furniture
Built-in Kitchen
Garage
Central heating
Last floor
Natural gas
Storage room
Urgent
Urgent
Benchmark interest rate from 12.1% / Benchmark effective rate from 14.21%. The nominal and effective interest rate tied to a public index represents the minimum amount for the credit product. The actual data will be specified at the time of loan approval. The interest rate shown in the table is linked to a public index - TIBR1M
Interest
Down payment
Base
Choose a house of any value and get full financing
Total area
Room
Bedroom
Floor
Total area
37 m²Room
2Bedroom
1Floor
2/12Description
For sale in Didube!!! Namely, on R. Agladze Street, in a premium quality multifunctional residential complex under construction by the developer company ""Sonnet Construction"", a non-standard 2-room apartment. The apartment has 1 bedroom. The living room is open-plan. It has 1 bathroom. 1 balcony. The complex consists of three blocks, which include residential, commercial and office spaces. All three blocks have two-level parking with a total of up to 400 parking spaces. The complex includes a playground, a children's entertainment square and planting of up to 50 trees and plants. The completion date of the C1 block of the complex is October 2024, the C2 block is December 2025, and the C3 block is the summer of 2026.
Details information
Condition
White Frame
Status
New building
Project
Non standard
Additional information
Balcony
Basement
Elevator
Furniture
Built-in Kitchen
Garage
Central heating
Last floor
Natural gas
Storage room
Benchmark interest rate from 12.1% / Benchmark effective rate from 14.21%. The nominal and effective interest rate tied to a public index represents the minimum amount for the credit product. The actual data will be specified at the time of loan approval. The interest rate shown in the table is linked to a public index - TIBR1M
Interest
Down payment
Base
Choose a house of any value and get full financing
Total area
37 m²Land
LandTypes.6.nameRoom
2Bedroom
1Floor
2/12Condition
White FrameStatus
New buildingProject
Non standard